Step-by-step instructions
Step 1
Measure the pedestal and service clearances, then mark the cabinet footprint on the floor with tape.
Step 2
Build side cabinets and a bridge that can separate for removal; keep the sink load independent.
Step 3
Add adjustable feet and a removable rear panel around the trap and shutoffs.
Step 4
Seal bathroom-facing edges and install doors with soft-close hinges that cannot strike the sink.
Step 5
Test access, ventilation, and stability before loading towels or toiletries.
Do not support or move the sink with the cabinet. Shut off water before plumbing work and consult a licensed professional if the drain or supply system is uncertain.
