Step-by-step instructions
Step 1
Inventory stored items by weight and frequency, then keep electrical panels, vehicle clearance, doors, and ignition sources unobstructed.
Step 2
Locate and verify framing, wiring, and plumbing; mark a level installation zone and the required edge fastener spacing.
Step 3
Cut or assemble the rated wall system and predrill components according to the manufacturer’s instructions.
Step 4
Fasten into structural framing with the specified screws and spacing, checking level and wall contact as each section is added.
Step 5
Install only compatible hooks and brackets, placing heavy items low and securing sharp or hazardous tools.
Step 6
Load one zone at a time below published limits and recheck fasteners after the first week of use.
Garage walls may conceal wiring, plumbing, fire-rated assemblies, or masonry. Verify before drilling, preserve panel and equipment clearances, and use a qualified professional when attachment or structural capacity is uncertain.